The execution of a study and drafting of a plan for the implementation of the BIM methodology in special linear work projects (bridges and tunnels) were carried out. This project consists of 4 phases:
- Phase 1: Study of existing workflows.
- Phase 2: Proposal for adaptation to the BIM.
- Phase 3: Implementation of the methodology through a pilot project.
- Phase 4: Monitoring of pilot projects.
Thanks to the procedure developed, it will be possible to identify the phases of the life cycles of the assets in which the inclusion of BIM is considered necessary, the people responsible for carrying it out, the software used, the communication flows between this software and the input documentation (models, documents...).