Roads in Spain
Roads in Spain: Informative Studies, Detailed Designs and Technical Assistance
Work on roads in Spain

 150 km in designs 

11 autonomous communities

 37 stretches of work

 

  • Roads in Spain

The State Road Network is essential for mobility of passengers and goods in Spain. Therefore, it is necessary to continually perform works to maintain and improve it. The works necessary to achieve these aims have been set out by the Ministry of Public Works in the Infrastructure, Transport and Housing Plan (PITVI, 2012-2024).

The Ministry of Public Works has entrusted Ineco with the execution of works on the road network in Spain, aimed at making it more efficient and consistent, strengthening its connectivity, and strengthening and improving road safety.

Ineco’s experience in developing this type of network, along with its team’s technical expertise, enables the company to design, plan and become involved in executing, operating, maintaining and managing roads. For this purpose, several informative studies have been conducted, as well as several works drawing up detailed designs and technical assistance while executing works on various stretches.

 

Data Sheet
Location: Spain
Client: : Ministry of Public works
Execution period: -
Market: Roads

Works on the entire network

 Among the work carried out, two works stand out in Madrid, aimed at improving connectivity and capacity on the outskirts with the drawing up of the improvement designs for the linking of highway A-6 with the M-40 and improving capacity in the context of the connection of the M-50 with the M-509. Additionally, in Madrid the informative study of a new high capacity route is being conducted, a variant of the existing A-1 between the M-12 and the municipality of El Molar.

 

In Lugo the works have begun drawing up the new stretch (Foz-Barreiros) of the new A-74 highway (A Mariña Highway), which will be the continuation of the high capacity road axis between Ferrol and San Ciprián, and will close the triangle comprised of the Cantábrico A-8 highway on the Galician stretch between Ribadeo and Baamonde and the AG-64 highway.

In Tarragona the works have begun to draw up the design for the widening of the N-340 between the localities of La Mora and La Pobla del Montornés, lending continuity to the A-7 on a 7 kilometre stretch and improving the capacity of a stretch with high traffic flow in summer due to its proximity to the Costa Daurada.

Several technical assistance works have begun during execution of the works:

In Huesca, on the Congosto de Isuela – Arguis stretch of Mudéjar highway (A-23), one of the latest stretches under construction, which will enable high capacity road connection between Sagunto and Jaca.

In Ávila supervision and surveillance is being carried out on the new bridge of La Gaznata over the El Burguillo Reservoir, which will improve the road safety conditions on a stretch with an average traffic flow in excess of 5,000 vehicles/day.

Since August 2016, Ineco has been providing technical assistance to the General Construction Subdirectorate, as a consequence of Order HAP/1169/2016 of 14 July, which regulates the 2016 year-end operations relating to the expenditure budget and off-budget operations. This contract provides a supervision and surveillance service, expropriations advice, environmental monitoring and health and safety coordination on works whose execution has already begun, covering 35 stretches. This service is a challenge due to the necessary agility required to make the resources available in a short timeframe.